Project Description

Whole Foods has always sought to build in an environmentally sensitive manner. Their store in Sugar Land, Texas is no exception. GPSI was proud to install this sustainable water feature and we took part in the process of development from the initial brainstorming of ideas with Hermes to the engineering of the MEP components that would control the flow of water to the installation. GPSI provided the training of Whole Foods personnel on how to maintain their water feature and provided a one-year warranty that is standard on all our projects.