Project Description

An interior fountain was installed in the Ford Motor Company Exhibit located inside Cowboys Stadium. GPSI worked with Xperience Communications in providing the hardscape, waterproofing, mechanical, electrical and plumbing installations for this project. This fountain is equipped with programmable LED lighting and the nozzles are capable of multiple rapid switching performances as they are linked to a solid state sequencing controller (PLC). Nozzle heights can be varied as each pump is operated with a Variable Frequency Drive. This interactive fountain is operational for all of the Cowboys Stadium functions and ceremonies.

Thank you for an outstanding job. It is truly amazing that in 4 months’ time our team was able to design, plan and build a fully automated fountain at all let alone on the fifth floor of the now Cowboys Stadium. The obstacles were seemingly endless but one by one we overcame them all which is a testament to the determination of the GPSI team.

Since its opening I have heard one compliment after another by our clients and the Cowboys regarding the overall look and feel of the space. The response by the public has been remarkable as well. The fountain has become the destination point we had hoped for as well as a photo op for the guest. All in all great work!

So, we live to work another day and I look forward to working with GPSI on those future projects.

Thanks to all once again.

Ian Roberson, Ford Motor Company