Project Description

BMS Managements new 22 story office tower is located at Westchase and the Beltway on Houston’s west side.  Adjacent the office tower on Westchase is a long linear detention pond converted into an amenity pond. The water feature within the pond consists of 5, 3” cascade jets spouting a white frothy cone of water 12’ in spray height.  Each nozzle is lite with 2, 65 watt LED white lights. The pump equipment supplying water to the nozzles is a large submersible pump vaulted alongside the west end of the detention basin.  The pump system is designed to manage surface debris using an easily removable stainless steel screen positioned at water surface elevation directly over the pump vault. The controls for the feature are housed in a mechanical room inside the building.

Scope of work: Design Build providing both engineering design & construction. Our construction scope included installation of all fountain MEP, pumps, controls, debris catchment systems and pump vault.