The Woodlands Turning Basin project consist of 3 cascading water effects.  Each Cascade is 25′ wide, 20′ long.  The design intent of this feature is to cascade water over ledgestone creating a beautiful display of tumbling white water.  Submersible pumps were placed in large sumps at the base of each of the weir cascades. From there water is pumped to treatment and filtration systems and back to the top of each weir.  Water Feature Controls are positioned above ground and treatment systems are vaulted in ground all the equipment is within 100′ of the feature. 

There are LED bar lights positioned in low profile walls on either side of each cascade.  The LED fixtures create a beautiful display of programmed colored light in the evenings.

Project was completed in Fall of 2017.